EVCS
Pro
Earth Volume Calculation System
Work files
New work
Rates
Settings
Guest · viewer
Sign out
Scheme
Data Entry
Pre Work
Post Work
Ditch
Action
Option
Graph Options
View/Edit Rate
Set District/UP
Settings
Report
Cross Section
Longitudinal Profile
Summary: Pre vs Design
Summary: Pre vs Post
Wheat: Pre vs Design
Wheat: Pre vs Post
Taka: Pre vs Design
Taka: Pre vs Post
Level Book: Pre-work
Level Book: Post-work
Ditch Details
Security
View
Help
Close
Copy
Remove
List
Add
Delete
Save
Compute
Return
Help
Exit
Pre-Work
(Earth Filling)
[Scheme Code :
41981-11-0002
Bench Mark :
10
]
Record Navigation
SL
Chainage
1
0+000.000
2
0+100.000
3
0+200.000
4
0+250.000
5
0+330.000
6
0+430.000
7
0+560.000
Total Section
7
General
Info
Flying
Re RL
Const Type
Staff Reading
Chainage
100
Ditch
Obst
Ch. Ref.
BR
HOI
11.03
FR
Distance
Inter SR
RL
CL
9.82
L1
9.80
L2
9.69
L3
9.63
L4
L5
L6
L7
R1
9.83
R2
9.80
R3
9.71
R4
R5
R6
R7
Design Data
Top Width
Turfing Width (Top)
Formation Level
Design Height
Soil Type
—
Clay & Silty
Clay
Clayey Silt
Sandy Silt
Sand
Silty Sand
Left Slope
Right Slope
Obst. left
Obst. right
Remark
Section result
Centre-line RL
9.82
Net fill area (m²)
0.785
Cutting area (m²)
0.000
Datum (m)
9
Pre-work X-sec area (m²)
4.10
Design X-sec area (m²)
4.89
Saved HOI 11.03; later stations pick up this HOI until their own BR and FR change it.
Station 0+100.000 — HOI 11.03
EVCS