EVCS
Pro
Earth Volume Calculation System
Work files
New work
Rates
Settings
Guest · viewer
Sign out
Scheme
Data Entry
Pre Work
Post Work
Ditch
Action
Option
Graph Options
View/Edit Rate
Set District/UP
Settings
Report
Cross Section
Longitudinal Profile
Summary: Pre vs Design
Summary: Pre vs Post
Wheat: Pre vs Design
Wheat: Pre vs Post
Taka: Pre vs Design
Taka: Pre vs Post
Level Book: Pre-work
Level Book: Post-work
Ditch Details
Security
View
Help
Close
Exit
Cross Section
[Scheme Code :
41981-11-0002
Bench Mark :
10
]
Grid
Design
Pre-work
Post-work
Options
Fill
Zoom
50%
70%
100%
150%
200%
Print
Save image
◀
0+000.000
0+100.000
0+200.000
0+250.000
0+330.000
0+430.000
0+560.000
▶
Cross Section — Chainage 0+200.000
-3
-2
-1
0
1
2
8
8.5
9
9.5
10
Offset from centre line (m)
RL (m)
Design
Pre-work
Post-work
Improvement of Road By 40mmDC From Rajnagar to Mostofapur Road, at Ch. 00m-560m Under Muradnagar Upazila, Cumilla. — datum 8 m
EVCS