41981-08-0001 — Kalipura Bazar to Bishnupur- Ramchandrapur RHD Road via Noagaon govt. P/School Road. at Ch. 00-2030m
20 stations · 0+000.000 → 2+030.000 · total 2030.000 m
Draft
Work ID 🔒41981-08-0001
Road ID41981
Road nameKalipura Bazar to Bishnupur- Ramchandrapur RHD Road via Noagaon govt. P/School Road. at Ch. 00-2030m
Road typeUNR
ProjectNONE
DivisionCHITTAGONG
DistrictCOMILLA
UpazilaMURADNAGAR
PourashavaNONE
Earthwork type1
Construction type1
Scheme FY2001-2002
Rate FY2001-2002
Benchmark (m) 🔒10.000
Paving width (m)3.049999952316284
Shoulder slope0
Wheat %1
Pre-work date2024-04-25
Post-work date—
RemarkTBM Taken On The Top of Wheel Guard AT Ch. 00m Culvert
ApprovedNo
Ignore cutYes
Locked fields are create-only: the work ID names the file and the benchmark is the level datum every future survey hangs on (spec §5, §8).
Chainages
20 stations · 0+000.000 → 2+030.000 · total 2030.000 m
ChainageCH refNextGap (m)Appl. len (m)LastFull gapRemark
Full gap marks a segment with no applied length: the legacy engine stored 0 there, so nothing is worked between this station and the next.
Rendering 20 rows through 0 mounted nodes — the whole ordered set comes from the API because next/applied-length/last/gap are properties of the full list (spec §10).
Computing…
Post-work (achieved earth)
Loading